The JG80LT, specially designed for railway infrastructure construction and maintenance, integrates a high-strength clam-shell bucket and a crawler chassis system. It demonstrates outstanding flexibility in complex terrains such as narrow tracks and high-drop slopes. Its double-paddle bucket can precisely open and close, efficiently handling tasks such as ballast stone removal, waste residue clearance, and bulk material handling, avoiding the disturbance of traditional buckets to the railway base bed. The reinforced rotating mechanism supports 360° non-stop operation, combined with an adjustable hydraulic pressure system, easily handling detailed engineering tasks such as sleeper replacement and drainage ditch excavation, making it the "all-rounder mechanical hand" for railway maintenance.
LEIA MAIS