As the backbone force for railway network maintenance, JG180LT is specifically designed for complex ballast engineering. Its low-center-of-gravity crawler chassis and reinforced anti-overturning structure enable stable operation on steep embankments and wet tracks, precisely performing ballast cleaning, sleeper gap filling, and roadbed contour reshaping. The patented hydraulic system integrates multi-level flow control to achieve micrometer-level bucket operation accuracy, ensuring uniform distribution of crushed stones and precise restoration of under-track support force, significantly reducing the risk of track settlement after train passage. The narrow body design also enables seamless entry into the extreme spaces between existing tracks and isolation fences, completely solving the industry pain point of inaccessible blind areas that traditional equipment cannot reach.
LEIA MAIS